Projects

From polymer production design to distillation and packed tower design, the Bell Engineering® firm produces outstanding results. Our portfolio continues to grow due to our pragmatic approach, our pro-active communication, and our practical designs.
72 continuous hours of constant flow rate testing managed end-to-end at a Permian Basin upstream operator site. Bell coordinated crews, third-party vendors, and produced water handling with zero unplanned restarts (December 2025 – March 2026).
57 operating facilities certified under 40 CFR Part 60 Subpart OOOOb across Texas and New Mexico. Field audits, ProMax simulation, and PE-sealed reports delivered site-by-site on the regulatory deadline (April 2025 – June 2025).
100,000+ PPM produced saltwater moved via 3+ miles of 8-inch layflat hose between two 22,000 BBL lake tanks across seven months of continuous field operations on a remote South Texas ranch. Zero environmental incidents (April 2024 – October 2024).
P&IDs, plot plans, equipment layouts, hose routing, and a complete installation bid package delivered in six weeks for a temporary water transfer and injection testing system on a remote South Texas property (February 2024 – March 2024).
PE-sealed structural corrosion assessment covering process units, tank farm structures, and pipe racks at a specialty fluoropolymer facility in Orange, Texas, with severity classification tied to the operator’s capital planning cycle (April 2023 – May 2023).
Two Louisiana upstream operator wellsites built out under Bell supervision. Pad construction, access roadway improvements, and site development delivered on the drilling schedule in challenging field conditions (August 2022 – November 2022).
14 upstream operator facilities certified under 40 CFR Part 60 Subpart OOOOa across Texas and New Mexico. Drone-documented, ProMax-simulated, and PE-sealed reports delivered ahead of the regulatory deadline (April 2022 – May 2022).
75 MMSCFD CO₂ flow handled end-to-end: compressed, condensed, and pumped to 2,100 psig for downstream sequestration from an ethanol plant source.
5,000 pressure relief devices evaluated and upgraded for a major client. Flare headers and PRDs revalidated to current safety standards.
Polymer reaction cycle reduced by over 50% through complete redesign and bench testing of an organic peroxide initiator system. Maintenance downtime virtually eliminated.